Install frameless shower screens at the Doncaster apartments
You are a glazier on Crew 3 working with the Glazing Supervisor.
What has happened
Kinross Property Developments has 24 frameless shower screens to be installed across levels 2 to 4 of a Doncaster apartment building over three days starting Friday 18 September. The panels are 10 millimetre toughened glass and were released from the Bayswater plant after a batch label check on 15 September. The builder has booked the lift for the crew from 7:00 am. Some bathrooms have stone floors and freshly grouted tiles, and the plumber is still working on level 4. Darren Whitlock wants the job safety analysis done with you on the first morning and every panel checked for its compliance label before it leaves the plant. A crack in transit last week has made load restraint a live topic.
Deliverables
- Panel label and edge check record
- Completed job safety analysis signed by the crew
- Installation photographs of completed screens
- Updated installation schedule record
Documents to use
Systems to use
Installation and Delivery Schedule
Schedules crews and trucks to sites, records site induction and job safety analysis completion and captures handover and call-back status.
Job Order Register
Tracks every job from confirmed order through production, dispatch and installation to handover, with the job pack details and current status.
WHS Incident and Hazard Register
Records every injury, near miss, hazard and property damage report, the investigation and the corrective actions to closure.
Units of competency
Current on training.gov.au for the Furnishing Training Package as at 10 September 2026.
MSFGG3033Install shower screensMSFGG3039Manually move glassMSFGG3029Assess glass and glazing requirementsMSFWHS301Identify installation work hazards and select risk control strategiesQualifications
MSF30422Certificate III in Glass and GlazingWhat to look for
Evidence guide
Evidence includes a job safety analysis that names the real hazards of this site, including manual handling in lifts, silica dust from drilling tiles and other trades, with controls in the hierarchy order. Observe two-person carries with the correct personal protective equipment, panels checked for labels, and screens installed plumb with clean sealant lines. The schedule record must be complete.