Fabricate the Lot 14 kitchen carcasses
You are a second year cabinet making apprentice in the cabinet factory.
What has happened
Merriwa Homes has a kitchen due for installation at Lot 14 Clyde North on Monday 22 September. The job pack for JO-26-1042 holds the approved drawings at revision C, a hardware schedule and the customer's colour selections. The white melamine board is in stock but the supervisor has not yet issued a cutting list for the base and overhead carcasses. The beam saw, edge bander and assembly benches are available on Thursday. The panel saw had a kickback near miss last week and the supervisor wants to see push sticks used on every narrow rip. The units must be on the dispatch rack by Friday afternoon so Crew 1 can load on Monday morning.
Deliverables
- Completed cutting list checked by the supervisor
- Completed materials requisition form
- Machine pre-start check records
- Inspection notes with measurements for each carcass
- Updated job order record
Documents to use
Systems to use
Job Order Register
Tracks every job from confirmed order through production, dispatch and installation to handover, with the job pack details and current status.
Plant and Machinery Register
Lists every machine, lifting device and vehicle with its risk assessment date, service schedule, status and authorised operators.
Materials and Stock Register
Holds the stock on hand of board, timber, hardware, foam, fabric, glass and consumables, with minimum levels, locations and reorder status.
Units of competency
Current on training.gov.au for the Furnishing Training Package as at 10 September 2026.
MSFFM3042Fabricate cabinetryMSFFM3031Prepare cutting lists from design and production documentationMSFFM3038Set up, operate and maintain automated edge banding machinesMSFFM3032Set up, operate and maintain sawing machinesMSFGN3005Read and interpret work documentsQualifications
MSF30322Certificate III in Cabinet Making and Timber TechnologyWhat to look for
Evidence guide
Look for a cutting list that reconciles to the drawings with correct allowances for edging and joints, evidence that pre-start checks were done before each machine was started, safe use of push sticks and extraction, and carcasses that measure square within tolerance. The job order update must reflect what was actually completed.